I15S over CHARLESTON BLVD

PROJECT NEON · County 003, Nevada · Built 2018 · 6 Lanes · 94,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
I3218S
Year Built
2018
Length
64.6 m (211.9 ft)
Max Span
34.7 m
Width
29.5 m (96.8 ft)
Lanes
6
Daily Traffic
94,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.