CC 215 over I 15

NORTH LAS VEGAS · County 003, Nevada · Built 2002 · 4 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I2499
Year Built
2002
Length
93 m (305.1 ft)
Max Span
47.7 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
5,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.