CHEYENNE AVENUE over CC 215 WEST

SW OF LAS VEGAS · County 003, Nevada · Built 2007 · 10 Lanes · 19,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I2325
Year Built
2007
Length
84.6 m (277.6 ft)
Max Span
43.8 m
Width
43.8 m (143.7 ft)
Lanes
10
Daily Traffic
19,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.