SUMMERLIN PARKWAY over RAMPART BL
LAS VEGAS · County 003, Nevada · Built 1995 · 2 Lanes · 37,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.177622, -115.287053
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 31 years old.
Nearby Bridges
SUMMERLIN PARKWAY over RAMPART BLVD
Built 1995
RAMPART BL over DRY WASH
Built 1994
SUMMERLIN PW over CHANNEL
Built 1990
CANYON RUN DRIVE over DRY WASH
Built 1998
DURANGO DR over SUMMERLIN PKWY
Built 2006
DURANGO DR over DRAIN-PEDESTRIAN TUNNEL
Built 2005
RAMPART BL & ALTA over DRY WASH
Built 1994
RAMPART BL over GOLF CART PATH
Built 1993
SUMMERLIN PW over TOWN CENTER DR
Built 1999
SUMMERLIN PW over TOWN CENTER DR
Built 1999
Bridge Details
- Structure #
- I2143E
- Year Built
- 1995
- Length
- 48.5 m (159.1 ft)
- Max Span
- 47.9 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 37,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.