RMP I215E TO LV BL over RMP I 15N TO I 215E
LAS VEGAS · County 003, Nevada · Built 1994 · 2 Lanes · 14,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.061656, -115.1781
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 32 years old.
Nearby Bridges
RAM I15S TO I215E over I 215
Built 1997
RMP 15N TO 215W over RMP 15S TO 215E
Built 1998
OFFRAMP 215W over OFFRAMP 15SB TO 215E&LVB
Built 2011
RAMP over I 215
Built 1998
I 15 NB F.& 215E R over I 215E/W
Built 2011
I 15 over I 215
Built 1997
I 15N over I 15 & I 215 RAMPS
Built 1994
I 15 over I 215
Built 1997
I 15S over I 15 & 215 RAMPS
Built 1994
OFFRAMP 215W TO FR over I 215E/W
Built 2011
Bridge Details
- Structure #
- I2006
- Year Built
- 1994
- Length
- 97.8 m (320.9 ft)
- Max Span
- 36.9 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 14,800
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,151,000
- Total Project Cost
- $1,727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.