RAINBOW BLVD over CC 215

SOUTH WEST LAS VEGAS · County 003, Nevada · Built 2005 · 8 Lanes · 39,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1997
Year Built
2005
Length
74.9 m (245.7 ft)
Max Span
37.4 m
Width
42.6 m (139.8 ft)
Lanes
8
Daily Traffic
39,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.