I 580 over SOUTH MEADOWS PKWY

RENO · County 031, Nevada · Built 1995 · 6 Lanes · 96,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1952
Year Built
1995
Length
84.7 m (277.9 ft)
Max Span
46.6 m
Width
36.9 m (121.1 ft)
Lanes
6
Daily Traffic
96,250
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.