I 580 over SR 431 Mt Rose

SW of Reno · County 031, Nevada · Built 2012 · 3 Lanes · 23,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1949S
Year Built
2012
Length
109 m (357.6 ft)
Max Span
58.5 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
23,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.