I 515 US95 US93 over SR592 FLAMINGO RD

LAS VEGAS · County 003, Nevada · Built 1986 · 7 Lanes · 153,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
I1452
Year Built
1986
Length
424.3 m (1392.1 ft)
Max Span
47.9 m
Width
40.7 m (133.5 ft)
Lanes
7
Daily Traffic
153,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,406,000
Total Project Cost
$21,609,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.