I 80W over SR659 E McCARRAN

SPARKS · County 031, Nevada · Built 1964 · 3 Lanes · 46,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
I1007W
Year Built
1964
Reconstructed
1975
Length
55.5 m (182.1 ft)
Max Span
14.3 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
46,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.