I 80 over WELLS AV

RENO · County 031, Nevada · Built 1970 · 7 Lanes · 124,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

39.536594, -119.803425

This bridge is in worse condition than 90.5% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
I 998
Year Built
1970
Length
40.8 m (133.9 ft)
Max Span
39.6 m
Width
35.6 m (116.8 ft)
Lanes
7
Daily Traffic
124,000
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,957,000
Total Project Cost
$5,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.