I 80W over CROSS ROAD

EAST OF ELKO · County 007, Nevada · Built 1964 · 2 Lanes · 5,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

40.933806, -115.665853

This bridge is in worse condition than 63.8% of bridges in County 007. The average bridge in Nevada is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
I 827W
Year Built
1964
Reconstructed
1979
Length
28.7 m (94.2 ft)
Max Span
10.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,600
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.