I 80W over SR425 THIRD ST
WEST OF RENO · County 031, Nevada · Built 1964 · 2 Lanes · 18,750 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.512206, -119.948558
This bridge is in worse condition than 90.5% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 62 years old.
Nearby Bridges
I 80E over SR425 THIRD ST
Built 1964
I 80 over TRUCKEE RIVER & SPRR
Built 1964
I 80 over TRUCKEE RIVER & SPRR
Built 1964
I 80 over HIGHLAND DITCH (OLD)
Built 1938
GARSON RD over I 80
Built 1964
I 80 over DITCH
Built 1964
FR WA05 over HIGHLAND DITCH (OLD)
Built 1964
I 80W over FRONTAGE ROAD
Built 1964
I 80E over FRONTAGE ROAD
Built 1964
SR425 3rd ST over TRUCKEE RVR
Built 1938
Bridge Details
- Structure #
- I 773W
- Year Built
- 1964
- Length
- 47.9 m (157.2 ft)
- Max Span
- 15.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 18,750
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $604,000
- Total Project Cost
- $906,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.