ACCESS ROAD TO G3 over ACCESS ROAD T3 & G3

SE OF LV AIRPORT AREA · County 003, Nevada · Built 2012 · 4 Lanes · 7,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
H3000
Year Built
2012
Length
36.1 m (118.4 ft)
Max Span
19.2 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
7,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.