SR 589/SAHARA AV over UPRR WESTERN INDUSTRIAL

LAS VEGAS · County 003, Nevada · Built 1966 · 6 Lanes · 61,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
G1064
Year Built
1966
Length
275.8 m (904.9 ft)
Max Span
22.9 m
Width
30.3 m (99.4 ft)
Lanes
6
Daily Traffic
61,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,155,000
Total Project Cost
$9,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.