FR 402 over UPRR

DUNPHY · County 011, Nevada · Built 1935 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

40.706897, -116.527703

This bridge is in worse condition than 96% of bridges in County 011. The average bridge in Nevada is 0 years old; this one is 91 years old.

Nearby Bridges

Bridge Details

Structure #
G 38
Year Built
1935
Reconstructed
1947
Length
49.7 m (163.1 ft)
Max Span
21 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$540,000
Total Project Cost
$810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.