Laughlin Parkway over Dry Wash

0.4mi N of Aha Macav Pkwy · County 003, Nevada · Built 2024 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B3328
Year Built
2024
Length
30.9 m (101.4 ft)
Max Span
3.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.