US95 over DRY WASH

1.8 mi S of SILVER PEAK R · County 003, Nevada · Built 2020 · 4 Lanes · 2,900 vehicles/day

Overall
Good
Culvert
7
Good

Condition Ratings

ComponentRatingDescription
Culvert 7 Good

Location

37.745833, -117.246944

This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
B3280
Year Built
2020
Length
11 m (36.1 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
2,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.