US6 over Ralston Wash

2.2m E of Tonopah · County 023, Nevada · Built 2023 · 2 Lanes · 1,350 vehicles/day

Overall
Good
Culvert
8
Very Good

Condition Ratings

ComponentRatingDescription
Culvert 8 Very Good

Location

38.068736, -117.180481

This bridge is in worse condition than 72.7% of bridges in County 023. The average bridge in Nevada is 0 years old; this one is 3 years old.

Bridge Details

Structure #
B3275
Year Built
2023
Length
7.8 m (25.6 ft)
Max Span
2.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,350
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.