US93 MP 55.50 over CHANNEL

MP 53 N OF I15 JCT · County 003, Nevada · Built 2019 · 4 Lanes · 4,200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B3236
Year Built
2019
Length
17.1 m (56.1 ft)
Max Span
3.7 m
Width
23.3 m (76.4 ft)
Lanes
4
Daily Traffic
4,200
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.