VETERANS PKWY over MIRA LOMA DRAINAGE

RENO-SE CONNECTOR · County 031, Nevada · Built 2018 · 6 Lanes · 17,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B3104
Year Built
2018
Length
121.9 m (399.9 ft)
Max Span
12.8 m
Width
40.4 m (132.5 ft)
Lanes
6
Daily Traffic
17,900
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.