EAST GALLERIA DRIV over CHANNEL

HENDERSON · County 003, Nevada · Built 2007 · 6 Lanes · 4,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B3043
Year Built
2007
Length
32.9 m (107.9 ft)
Max Span
29.6 m
Width
32.9 m (107.9 ft)
Lanes
6
Daily Traffic
4,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.