BRUCE ST over DRAINAGE CHANNEL

NORTH LAS VEGAS · County 003, Nevada · Built 2002 · 2 Lanes · 230 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B2258
Year Built
2002
Length
6.2 m (20.3 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
230
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.