TOMIYASU LANE over DUCK CREEK
LAS VEGAS · County 003, Nevada · Built 1993 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
36.060592, -115.104861
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 33 years old.
Nearby Bridges
FAU 608 - PECOS RD over DUCK CREEK
Built 1991
WARM SPRING over DUCK CREEK
Built 1994
TOPAZ ST over DUCK CRK
Built 2004
S. EASTERN AVE over DUCK CREEK
Built 1994
ELDORADO LN over DUCK CREEK
Built 2010
SUNSET ROAD over DUCK CREEK
Built 1982
SPENCER STREET over DUCK CREEK
Built 2009
PECOS ROAD over PITTMAN WASH
Built 1992
ROBINDALE RD over DUCK CRK
Built 2000
PATRICK LN over DUCK CREEK
Built 1994
Bridge Details
- Structure #
- B2075
- Year Built
- 1993
- Length
- 22.3 m (73.2 ft)
- Max Span
- 11 m
- Width
- 18.9 m (62 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.