SR 595/RAINBOW BL over FLAMINGO WASH

SOUTHWEST OF LAS VEGAS · County 003, Nevada · Built 1984 · 6 Lanes · 44,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1811
Year Built
1984
Length
25.9 m (85 ft)
Max Span
10.7 m
Width
36.6 m (120.1 ft)
Lanes
6
Daily Traffic
44,500
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.