BRIDGE ST VERDI over POWER CANAL

VERDI · County 031, Nevada · Built 1968 · 2 Lanes · 2,613 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B1686
Year Built
1968
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,613
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$142,000
Total Project Cost
$213,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.