US 50 over V-CANAL

WEST OF FALLON · County 001, Nevada · Built 1980 · 6 Lanes · 16,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B1558
Year Built
1980
Length
7.8 m (25.6 ft)
Max Span
2.5 m
Lanes
6
Daily Traffic
16,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$407,000
Total Project Cost
$610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.