SR159 CHARLESTON over LAS VEGAS WASH

LAS VEGAS · County 003, Nevada · Built 1971 · 6 Lanes · 55,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1539
Year Built
1971
Length
45.7 m (149.9 ft)
Max Span
9.8 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
55,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.