SPENCER ST over FLAMINGO WASH

LAS VEGAS · County 003, Nevada · Built 2002 · 4 Lanes · 6,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B1525
Year Built
2002
Length
11.2 m (36.7 ft)
Max Span
10.7 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
6,400
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.