IRR SR225 MTN CTY over HENDRICKS CRK
SOUTH OF MOUNTAIN CITY · County 007, Nevada · Built 1968 · 2 Lanes · 400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.684861, -115.8042
This bridge is in worse condition than 91.9% of bridges in County 007. The average bridge in Nevada is 0 years old; this one is 58 years old.
Bridge Details
- Structure #
- B1267
- Year Built
- 1968
- Length
- 29.5 m (96.8 ft)
- Max Span
- 29.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $640,000
- Total Project Cost
- $870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.