I15 over Dry Wash

North of Speedway · County 003, Nevada · Built 1963 · 6 Lanes · 26,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B1043
Year Built
1963
Reconstructed
2024
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
6
Daily Traffic
26,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.