I 15 over VANDENBERG WASH

NORTH LAS VEGAS · County 003, Nevada · Built 1970 · 8 Lanes · 65,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B 976
Year Built
1970
Length
13.7 m (44.9 ft)
Max Span
4.3 m
Lanes
8
Daily Traffic
65,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$194,000
Total Project Cost
$292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.