I 15 over BOULDER JCT WASH

LAS VEGAS · County 003, Nevada · Built 1964 · 16 Lanes · 199,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B 791
Year Built
1964
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Lanes
16
Daily Traffic
199,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.