US 395 over GALENA CRK

PLEASANT VLY SOUTH OF REN · County 031, Nevada · Built 1960 · 4 Lanes · 6,900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B 752
Year Built
1960
Reconstructed
1968
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
6,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$246,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.