US 95 over DRY WASH

NORTH OF FALLON · County 001, Nevada · Built 1957 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Culvert
7
Good

Condition Ratings

ComponentRatingDescription
Culvert 7 Good

Location

39.708694, -118.76985

This bridge is in worse condition than 64.3% of bridges in County 001. The average bridge in Nevada is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
B 655
Year Built
1957
Length
10.1 m (33.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$135,000
Total Project Cost
$203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.