SR582 BOULDER HWY over FLAMINGO WASH
NW OF HENDERSON · County 003, Nevada · Built 1931 · 4 Lanes · 17,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
36.141192, -115.096575
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 95 years old.
Nearby Bridges
SR582 BOULDER HWY over FLAMINGO WASH
Built 2001
I 515 US 95 US 93 over FLAMINGO WASH
Built 1986
I 515 US95 US93 over SAHARA AVENUE
Built 1986
I 515 US95 US93 over SR582 BOULDER HWY
Built 1986
MOJAVE RD over FLAMINGO WASH
Built 1978
LAMB BL over FLAMINGO WASH
Built 1970
I 515 US95 US93 over WYOMING AVENUE
Built 1986
I 515 US95 US93 over SR590 DESERT INN RD
Built 1981
DESERT INN RD over FLAMINGO WASH
Built 1967
I 515 US95 US93 over DRAINAGE
Built 1986
Bridge Details
- Structure #
- B 194S
- Year Built
- 1931
- Reconstructed
- 1973
- Length
- 23.8 m (78.1 ft)
- Max Span
- 11.8 m
- Width
- 18.2 m (59.7 ft)
- Lanes
- 4
- Daily Traffic
- 17,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.