IRR US 395 over ALLERMAN CANAL

SOUTH OF GARDNERVILLE · County 005, Nevada · Built 1927 · 2 Lanes · 12,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B 161
Year Built
1927
Reconstructed
1970
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
24.1 m (79.1 ft)
Lanes
2
Daily Traffic
12,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$292,000
Total Project Cost
$438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.