FIRST STREET over DRAINAGE DITCH
SOUTH GATE NAS FALLON NV · County 001, Nevada · Built 1985 · 2 Lanes · 600 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.402389, -118.706258
This bridge is in worse condition than 77.1% of bridges in County 001. The average bridge in Nevada is 0 years old; this one is 41 years old.
Nearby Bridges
US 50 over UPPER DIAGONAL DRAIN
Built 1959
US 50 over REROUTED DIAGONAL DRAIN
Built 2017
US 50 over RIVER EXTENSION DRAIN
Built 1959
US 50 over HL4 DRAIN
Built 1959
NORTH CROOK ROAD over S CANAL
Built 2011
US 95 over AA-CANAL
Built 1954
NEW RIVER PKWY over L CANAL
Built 2013
SR 115 HARRIGAN RD over L LINE CANAL
Built 2016
SR718 LONETREE RD over DRAINAGE CANAL
Built 1941
ALLEN ROAD over AA CANAL
Built 1975
Bridge Details
- Structure #
- 1NV0226
- Year Built
- 1985
- Length
- 8.7 m (28.5 ft)
- Max Span
- 4.6 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $13,000
- Total Project Cost
- $75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.