FOREST ROUTE 50084 over INDIAN CREEK
7 MI N OF PARADISE VALLEY · County 013, Nevada · Built 1998 · 1 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.603883, -117.539483
This bridge is in worse condition than 35.2% of bridges in County 013. The average bridge in Nevada is 0 years old; this one is 28 years old.
Bridge Details
- Structure #
- 040905000001083
- Year Built
- 1998
- Length
- 9.5 m (31.2 ft)
- Max Span
- 9.4 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $98,000
- Total Project Cost
- $98,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.