BIA IRR RTE 203 over SHEEP CREEK
17.3 KM SW OF OWYHEE · County 007, Nevada · Built 1988 · 1 Lanes · 5 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.854833, -116.266139
This bridge is in worse condition than 91.9% of bridges in County 007. The average bridge in Nevada is 0 years old; this one is 38 years old.
Bridge Details
- Structure #
- 0000H64641B0327
- Year Built
- 1988
- Length
- 48.1 m (157.8 ft)
- Max Span
- 3.7 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Wood or Timber
- Design
- Girder and Floorbeam System
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.