IRR BIA ROUTE 213 over REESE RIVER
0.8 KM EAST OF NV HWY 21 · County 023, Nevada · Built 2001 · 2 Lanes · 15 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.094306, -117.389694
This bridge is in worse condition than 72.7% of bridges in County 023. The average bridge in Nevada is 0 years old; this one is 25 years old.
Bridge Details
- Structure #
- 00000000000H317
- Year Built
- 2001
- Length
- 29.1 m (95.5 ft)
- Max Span
- 15 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 15
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.