WALKER RD/FAS5802 over NPPD TAILRACE CANAL
JCT I80/US83 .5S .5E · County 111, Nebraska · Built 2009 · 2 Lanes · 500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
41.1044, -100.7539
This bridge is in worse condition than 40.1% of bridges in County 111. The average bridge in Nebraska is 0 years old; this one is 17 years old.
Nearby Bridges
I80 over NPPD POWER CANAL
Built 1966
I80 over NPPD POWER CANAL
Built 1966
TECH COLLEGE ROAD over NPPD POWER CANAL
Built 1964
SB-US83 over I80
Built 1995
NB-US83 over I80
Built 1995
US83 over STREAM
Built 1952
US83 over FREMONT SLOUGH
Built 1974
US83 over FREMONT SLOUGH
Built 1965
COUNTY HIGHWAY over FREMONT SLOUGH
Built 1958
FAS 1480 over NPPD TAILRACE CANAL
Built 1935
Bridge Details
- Structure #
- U177526510
- Year Built
- 2009
- Length
- 46.6 m (152.9 ft)
- Max Span
- 15.5 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.