NST over ANTELOPE CREEK

NST @ 22ND LINCOLN · County 109, Nebraska · Built 2008 · 2 Lanes · 4,060 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
U142503415P
Year Built
2008
Length
57.3 m (188 ft)
Max Span
21.9 m
Width
18.8 m (61.7 ft)
Lanes
2
Daily Traffic
4,060
Material
Prestressed Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.