CENTRAL AVE over PLATTE RIVER N CHANNEL

KEARNEY CENTRAL @ LANDON · County 019, Nebraska · Built 1998 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
U1350A3705
Year Built
1998
Length
18.9 m (62 ft)
Max Span
18.3 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.