I680 BRG#13N&S over N38

CENTER ST INTRCHG · County 055, Nebraska · Built 1996 · 8 Lanes · 154,030 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S680 00083
Year Built
1996
Reconstructed
2008
Length
63.7 m (209 ft)
Max Span
38.7 m
Width
45 m (147.6 ft)
Lanes
8
Daily Traffic
154,030
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.