US275/N92 over UPRR/STOCKYRDS

1W MISSOURI RIVER BRG · County 055, Nebraska · Built 1968 · 4 Lanes · 19,820 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S275 18888
Year Built
1968
Reconstructed
2012
Length
378.6 m (1242.1 ft)
Max Span
40.8 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
19,820
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.