HWY 275 over PEBBLE CREEK OVERFLOW

0.7NW SCRIBNER · County 053, Nebraska · Built 2024 · 2 Lanes · 6,230 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
S275 12952R
Year Built
2024
Length
109.7 m (359.9 ft)
Max Span
39.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,230
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.