US275 over PLUM CREEK

2NW WEST POINT · County 039, Nebraska · Built 2023 · 2 Lanes · 5,640 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S275 11475R
Year Built
2023
Length
61.6 m (202.1 ft)
Max Span
21.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
5,640
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.