N105 over LONG BRANCH

10S JOHNSON · County 127, Nebraska · Built 2021 · 2 Lanes · 340 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S105 01771
Year Built
2021
Length
43.3 m (142.1 ft)
Max Span
15.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
340
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.