US81/N92 over DAVIS CREEK

IN OSCEOLA · County 143, Nebraska · Built 2022 · 2 Lanes · 3,970 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
S081 08543
Year Built
2022
Length
20.6 m (67.6 ft)
Max Span
19.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,970
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.